A Six story office complex, “Six Green Star” rating energy efficient building in Sydney containing 1,000 chilled beams.

| As Design | 8 beam unit (as per design) |
Using TA-H.U.B |
||
Cost of assembly 'A' per chilled beam |
||||
Materials (automatic balancing, ball valve, test points) |
$150.00 |
|||
Installation (labour) |
$210.00 |
|||
SUB TOTAL |
$360.00 |
$2,880.00 |
||
Cost of assembly 'B' per chilled beam |
||||
Materials (automatic balancing, ball valve, test points) |
$290.00 |
|||
Installation (labour) |
$210.00 |
|||
SUB TOTAL |
$500.00 |
$500.00 |
||
![]() |
Cost of copper pipe (25 & 32 mm) |
$225.00 |
||
TA-H.U.B. |
||||
Installation of TA-H.U.B. |
||||
TOTAL (for 8 chilled beams) |
$3,605.00 |
$3,020.00 |
||
Cost per chilled beam |
$450.00 |
$377.00 |
||
TOTAL (FOR 1,000 MODULES) |
$450,630.00 |
$377,500.00 |
||
A total saving of $73,130.00 (equal to approx. 20%) There is more! Not included are the savings in actuator wiring and insulation |
||||